Building Permit
First Generation Tenant Improvement. Proposed gym use.
- Area
- ZIP 78704 area
- Reported value
- $0
This market has enough unique inventory to show fire & security activity and match reasons.
First Generation Tenant Improvement. Proposed gym use.
install a lawn sprinkler system
Interior remodel to existing office suite with minor MEP scope. No access control or change of use.
Interior remodel to existing office suite with minor MEP scope. No access control or change of use.
ETJ - Install Sprinkler System
install a full lawn sprinkler system.
ETJ - Install Sprinkler System
ETJ - Install Sprinkler System
Interior remodel to combine suites 120 and 170 to create new common area amenity space for the building. No change of use. Common area is accessory to the admin office building. A…
Building 2 2 Story SFR rear of main house with alley access - ADU / Garage
Building 1 Home: New construction of two-unit residential homes.
The interior remodel of an existing office space in an existing sprinklered building. No change of use. No access control.
Install Sprinkler System
Interior remodel to office admin suite. No change of use. No access control. MEP scope shown on Arch sheets and signed off by Master Electrician.
7 DAY - Interior first time finish out of existing retail tenant space. New demising wall. No change of use required site plan shows retail use. Grease trap approved in basebuildi…
Interior tenant finishout of commercial office space less than 5000 sq ft.
Install Sprinkler System
Interior remodel to existing admin office. No change of use. No access control
Tenant finish out to convert existing mercantile space into clinic/outpatient (botox). Please reference current site plan exemption request 2026-084309 DA.
Interior remodel to existing office suite with minor MEP scope. No access control or change of use.
Phase 2 Interior remodel to existing manufacturing/office tenant space. Confidential Plans please do not make available to public portal. No exterior work. No access control.
Phase 1 Interior remodel to existing manufacturing/office tenant space. Confidential Plans please do not make available to public portal. No exterior work. No access control.
Phase 1 Interior remodel to existing manufacturing/office tenant space. Confidential Plans please do not make available to public portal. No exterior work. No access control.
Phase 1 Interior remodel to existing manufacturing/office tenant space. Confidential Plans please do not make available to public portal. No exterior work. No access control.