Building Permit
Express: Foundation repair - install 18 push piers
- Area
- ZIP 78739 area
- Reported value
- $1
This market has enough unique inventory to show new construction activity and match reasons.
Express: Foundation repair - install 18 push piers
Interior Non-Structural Finish Out [10 Day Review]
Express - Remove and Replace 1 window like for like no structural changes.
New construction of an Level 8 swimming pool at approved site.
Installation of an in-ground pool with a new concrete deck spa water pool & spa coping and equipment pad. retroactive deck permit for 105 sqft wood deck addition.
Construction of new in-ground pool with associated equipment pad.
Express - Foundation Repair
Express: Foundation repair
ENCLOSE EXISTING 12X12 PATIO WITH UNTOUCHED BALCONY ABOVE. ADD OPERABLE WINODWS AND DOOR. RELOCATE EXISTING SWITCHES RELOCATE OUTLETS
UNIT # 179: New construction condo use single-family residential 2-story 4 bedroom 3 bath with attached 2-car garage covered front porch and covered rear patio. PUD UNIT # 179
UNIT # 179: New construction condo use single-family residential 2-story 4 bedroom 3 bath with attached 2-car garage covered front porch and covered rear patio. PUD UNIT # 179
New construction accessory use in-ground pool and spa w/ concrete decking.
Addition/Remodel- SFR remodel 2 story addition to create new kitchen rear covered porch addition and second floor addition 1 bed 1 bath. Existing woodshed to be brought into a set…
Express - Remove and replace 1 window like for like no structural changes.
Express - Replace 14 windows like for like no structural changes.
BASE: Installing a backup battery system and additional meter socket.
BASE: Installing a backup battery system and additional meter socket.
BASE: Installing a backup battery system and additional meter socket.
BASE: Installing a backup battery system and additional meter socket.
BASE: Installing a backup battery system and additional meter socket.
SP Condo: New construction of 2 story sfr condo - 3 bedrooms 2.5 baths attached garage covered patio
BASE: Installing a backup battery system and additional meter socket.
BASE: Installing a backup battery system and additional meter socket.
BASE: Installing a backup battery system and additional meter socket.