PERMIT – EXPRESS PERMIT PROGRAM
TUCKPOINTING AND UNIT MASONRY REPAIR / REPLACEMENT: 15 SQ. FT., LINTEL QTY. 1, MAX. LENGTH 4. LOCATION: ABOVE 2ND FLOOR WINDOW ON WEST SIDE OF BUILDING..
- Area
- Community Area 22
- Reported value
- $4,980
This market has enough unique inventory to show openings & insulation activity and match reasons.
TUCKPOINTING AND UNIT MASONRY REPAIR / REPLACEMENT: 15 SQ. FT., LINTEL QTY. 1, MAX. LENGTH 4. LOCATION: ABOVE 2ND FLOOR WINDOW ON WEST SIDE OF BUILDING..
FOR PERMIT 101041165: ADDITIONAL PLUMBING CONTRACTOR. REPLACEMENT ELECTRICAL CONTRACTOR. REPLACEMENT GENERAL CONTRACTOR. NEW CONTRACTOR(S) LISTED UNDER "OTHER APPLICANTS AND CO…
SCOPE: NONSTRUCTURAL INTERIOR ALTERATION OF EXISTING SFR, INCLUDES NEW FINISHES, FLOORS, DOORS, NEW FRAMING AT CLOSETS AND BATHROOM, RELOCATION OF EXISTING ELECTRICAL, NEW SHOWER…
IN-KIND REPLACEMENT OF EXTERIOR WINDOWS AND DOORS IN EXISTING OPENINGS. REPLACEMENT WINDOWS: 2; REPLACEMENT SKYLIGHTS: 0; REPLACEMENT DOORS: 0. AFFECTS: 1 RESIDENTIAL UNIT(S), 0 N…
TEMPORARY SCAFFOLDING: QTY: 1, MAX. LENGTH: 40 FT., MAX. HEIGHT: 50 FT. LOCATION: EXTERIOR WINDOWS. PERMIT EXPIRATION DATE: 365 DAYS FROM PERMIT ISSUED DATE THIS PERMIT IS NOT…
SCOPE: NONSTRUCTURAL INTERIOR ALTERATION TO REPLACE DRYWALL, ELECTRICAL, PLUMBING AND INTERIOR DOORS WITH THE ADDITIONA OF INSULATION AT UNFINISHED ATTIC. ALL WORK SAME AS EXISTIN…
SCOPE: NONSTRUCTURAL INTERIOR REMOVAL OF UNPERMITTED RESIDENTIAL UNIT FEATURES AT BASEMENT OF SFR, CAP AND REMOVE BATHROOM AND KITCHEN BASEMENT PLUMBING AT ITS SOURCE AND RESTORE…
REVISION TO PERMIT 101084407, 2019 CBRC - SELF CERT RES.: PARTIAL LOWER LEVEL - REMOVE AND REPLACE FOUNDATION UNDER EXISTING REAR ADDITION OF EXISTING SINGLE FAMILY HOME PER ATTA…
SELF-CERT 2019 CBRC: INTERIOR ALTERATIONS IN EXISTING OFFICE BUILDING ON THE 5TH FLOOR OFFICE SUITE 535. NEW PARTITIONS DOORS CEILINGS LIGHTING AND FINISHES THROUGHOUT. NEW MECHAN…
SC 2019 CBRC: BUILD OUT OF INTERIOR PARTITION WITH AA DOOR IN OPEN OFFICE SPACE, LOCATED ON THE 23RD FLOOR OF A 50 STORY COMMERCIAL BUILDING. NO CHANGE TO DEMISING WALLS OR COMMON…
REAR 2-ND STORY ROOM ADDITION TO EXISTING 1-STORY BRICK-FRAME ADDITION
INTERIOR & EXTERIOR RENOVATIONS TO CONVERT 2ND & 3RD FLOOR (2) D.U. INTO (4) D.U. ON MIXED-USE MULTI-FAMILY MASONRY BUILDING WITH EXIST. HAIR SALON GROUND FLOOR (NO WORK) & BASEME…
SPR 2019 CBC (STANDARD) FULL BUILDINGTHE WORK INCLUDES THE INTERIOR REMODELING ON THE FIRST AND SECOND FLOOR (WINDOW REPLACEMENT & 35 SF LOFT EXTENSION) OF AN EXISTING 3 STORY MAS…
SPR 2019 CBRC - INTERIOR AND EXTERIOR RENOVATIONS TO AN EXISTING 3 STORY 6 DWELLING UNIT RESIDENCE WITH BASEMENT AND REAR PORCH WITH STAIRS TO CONVERT TO 8 DWELLING UNITS WITH A N…
SPR 2019 CBCERECT REAR 2 STORY FRAME ADDITION, INTERIOR REHABILITATION AND NEW REAR OPEN WOOD DECK AT EXISTING 2 STORY WITH BASEMENT SFR AS PER PLAN.
TUCKPOINTING AND UNIT MASONRY REPAIR / REPLACEMENT: 50 SQ. FT., LINTEL QTY. 32, MAX. LENGTH 11. LOCATION: WINDOWS LENTELS.
IN-KIND REPLACEMENT OF EXTERIOR WINDOWS AND DOORS IN EXISTING OPENINGS. REPLACEMENT WINDOWS: 3; REPLACEMENT SKYLIGHTS: 0; REPLACEMENT DOORS: 0. AFFECTS: 1 RESIDENTIAL UNIT(S), 0 N…
SELF CERTIFIED 2019 CBC. REVISION TO PERMIT # 101076697 TO REMOVE GARAGE ROOF TOP DECK & PERGOLA, ELIMINATE 2 WINDOWS IN FAMILY ROOF, NEW GAS VENT FREE FIREPLACE AND LAYOUT CHANGE…
SELF-CERT 2019 CBRC: DORMER ADDITION & FIRE RESTORATION W/ INTERIOR ALTERATION & CODE UPGRADES FOR EXISTING 2 STORY W/ BASEMENT SINGLE FAMILY RESIDENCE BUILDING NO CHANGE IN DWELL…
SPR 2019 CRBC; EXIST. 2 STORY BRICK 2 DU RESIDENTIAL UNIT. ADD NEW ADDITIONAL DWELLING UNIT (ADU) IN BASEMENT. NEW KITCHEN, MODIFY EXISTING DUCTWORK, PROVIDE NEW EXTERIOR WINDOW…
SPR 2019 CBRC: CONSTRUCT A NEW OPEN PORCH ROOF AND COLUMNS ON THE EXISTING CONCRETE STOOP AND INCLUDE NEW LIGHT FIXTURE MOUNTED TO ROOF. REMOVE AND REPLACE SIDING ON SECOND FLOOR…
RS-3 - SPR 2019 CBRC SINGLE-FAMILY ADDITION TO SECOND FLOOR AND INTERIOR ALTERATION OF KITCHEN/FAMILY ROOM ON FIRST FLOOR ONLY. RS-3 USE GROUP TO REMAIN AS-IS.
REMODEL OF AN EXISTING SINGLE FAMILY HOME - NEW SECOND FLOOR ADDITION (2 STORIES + CRAWL SPACE) - REBUILD BASEMENT STAIRS - NEW REAR DECK. ZONED RS-2, OCCUPANCY R-5, VA CONSTRUCTI…
SPR 2019 CBRC - DE-CONVERT FROM 3 DU TO ORIGINAL 2 DU, INTERIOR RENOVATIONS TO EXISTING BASEMENT TO REMOVE DWELLING UNIT AND RETURN TO USE AS COMMON BASEMENT IN AN EXISTING 2 STOR…