Sprinklers
APPLICATION FILED FOR SPRINKLER ADDITIONS/MODIFICATIONS ON THE 2ND FLOOR AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
- Area
- West Village, ZIP 10014
- Reported value
- $2,700
This market has enough unique inventory to show fire & security activity and match reasons.
APPLICATION FILED FOR SPRINKLER ADDITIONS/MODIFICATIONS ON THE 2ND FLOOR AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
mechanical application hereby filed in conjunction with new building application no. 321589027
FOUNDATION AND EARTH WORK FOR PROPOSED NEW BUILDING
INSTALLATION OF NEW SPRINKLER SYSTEM THROUGHOUT IN CONJUNCTION WITH ALTERATION CO.
MODIFICATION TO EXISTING FIRE SPRINKLER SYSTEM FOR INTERIOR ALTERATION TO EXISTING APARTMENT ON THE 2ND FLOOR.
FILING FOR PLUMBING AND SPRINKLER WORK ASSOCIATED WITH INTERIOR DEMO OF 29TH AND 30TH FLOORS AS PER PLANS SUBMITTED HEREWITH.
Propose sprinkler modifications at existing 001 floor commercial space renovation all as per plans herewith filed.
Herewith filing plumbing and sprinkler systems associated with new 6-story residential building.
Filing herewith sprinkler work at existing 11th floor space, MZ Wallace. No change in use, egress or occupancy.
Sprinklers interior alteration to create new restaurant Serafina
Sprinkler/Standpipe work in conjunction with New Building
FILE HEREWITH PLUMBING & SPRINKLER WORK AS PER PLAN IN CONJUNCTION WITH APPLICATION Q01333068-I1.
Plumbing work per plans filed herewith.
INTERIOR RENOVATION TO BUILD COMMERCIAL LAUNDRY. WORK INCLUDES NEW INSTALLATION OF WASHING MACHINES, DRYERS, WATER HEATER AND SPRINKLERS.
Installation of temporary sprinkler loop as per the filed drawings. No change to use, occupancy or egress.
Installation of 13 new sprinkler heads on the 2nd floor. No change to the existing use, occupancy, or means of egress.
Sprinkler/Standpipe for NB
Relocate and install sprinkler heads on the cellar level, 1st floor through 5th floor, and penthouse as per plans submitted herewith. There are no change to use, egress or occupan…
Proposed Installation of Automatic Sprinkle System
SUBSEQUENT SPRINKLER APPLICATION IN CONJUNCTION WITH APPROVED GC # B01043157-I1
INTERIOR RENOVATION TO BUILD COMMERCIAL LAUNDRY. WORK INCLUDES NEW INSTALLATION OF WASHING MACHINES, DRYERS, WATER HEATER AND SPRINKLERS.
Modification to existing sprinkler system and plumbing fixtures as per plans filed herewith. NO change in use, egress or occupancy.
Sprinkler modifications to the 3rd floor as per plans filed herewith. No change in use, egress, or occupancy.
OT Lighting and OT Electrical to remove Fire Alarm wiring.