Mechanical Systems
REMOVAL OF EXISTING HEATING SYSTEM (BOILER) AND THE INSTALLATION OF NEW HVAC AND VENTILATION EQUIPMENT FOR A RENOVATED 1-FAMILY HOME
- Area
- Prospect Lefferts Gardens-Wingate, ZIP 11225
- Reported value
- $50,000
This market has enough unique inventory to show hvac activity and match reasons.
REMOVAL OF EXISTING HEATING SYSTEM (BOILER) AND THE INSTALLATION OF NEW HVAC AND VENTILATION EQUIPMENT FOR A RENOVATED 1-FAMILY HOME
Installation of mechanical equipment & related piping / ductwork as shown on plan set filed herewith. Filed in conjunction with ALT CO application for renovation to SRO Class-B pr…
Replacement of existing kitchen exhaust from the 1st floor to the roof as indicated on drawings.
INSTALLATION OF LOADING PLATFORM IN CONJUCTION WITH NB 121192299. THIS APPLICATION INVOLVES NO CHANGE IN USE OCCUPANCY OR EGRESS.
Install mechanical systems in conjunction with GC job Q01275009-I1. There is no change in use, occupancy, or egress.
INSTALLATION OF TEMPORARY PERSONNEL HOIST AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
MECHANICAL MODIFICATIONS (OFFICE RENOVATION) ON THE CELLER, 1ST & 2ND FLOOR AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
INSTALLATION OF NEW AIR CONDITIONING SYSTEM IN EXIST. APT 18G NO CHANGE IN USE EGRESS OR OCCUPANCY
Mechanical work in conjunction with the NB application #X01311362-I1
MH WORK ASSOCIATED WITH GC AND PL FILING. NO CHANGE TO USE, OCCUPANCY OR EGRESS.
DESIGN INCLUDES MODIFICATION OF THE EXISTING DUCTWORK, AND INSTALLATION OF BUILDING VENTILATION SYSTEMS AND COOLING SYSTEM. NO CHANGE IN USE, EGRESS, OR OCCUPANCY UNDER THIS FILIN…
INSTALL REPLACEMENT CHIMNEY AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
Mechanical work as per plans for a tenant fit out
INSTALLATION OF AC EQUIPMENT IN THE DEVIL CAFE AS PER SUBMITTED DRAWINGS. NO CHANGE OF USE, EGRESS OR OCCUPANCY
INSTALLATION AND USE OF TEMPORARY MATERIAL PLATFORMS AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
Mechanical Equipment Use on Grade During the Mechanical Phase of a 1-Story Full Demolition Job# Q01393773-I1.
INSTALLATION OF TEMPORARY ENGINEERED ENCLOSURE SYSTEM AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY
PROPOSED CONSTRUCTION OF A NEW TWO-STORY, TWO-FAMILY DWELLING AT THE SUBJECT PROPERTY, AS SHOWN ON THE PLOT PLAN. OBTAIN NEW CERTIFICATE OF OCCUPANCY.
Filing herewith for the installation of mechanical/hvac scope as per plans.
FILE TO CONVERT FIRST FLOOR FROM LAUNDRY STORE TO RETAIL STORE WITHIN THE SAME USE GROUP. GC WORK ON CELLAR AND 1ST FLOOR. ALSO INSTALL AC UNITS FOR THE OCCUPANCY.
Install temporary accessory walk-in refrigerator boxes in existing open space. No change in egress, use or occupancy.
MECHANICAL SPECIFICATIONS FILED IN CONJUNCTION WITH GC APPLICATION B01348242-I1
INSTALLATION & USE OF HOIST AS PER DRAWINGS ATTACHED HEREWITH
INSTALLATION OF TEMPORARY PERSONNEL HOIST AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.